ARSS's Role in Your Green Roof

No file selected.

Green Roofing Experts know that waterproofing is a crucial component of all Green Roofs & Walls

Green Roofing and Green Walling in the know will tell you that Wetsuit is the only membrane worth considering. 

 

As Wetsuit waterproofing experts - A.R.S.S. will be your new best friends. 

 

Typical Green Roof Construction

The production of a Green Roof or Green Wall is typically a three phase process of SpecificationDesign & Construction.

On top of the structural components, there are typically seven layers to a green roof:

  1. Waterproofing membrane
  2. Root barrier (polyethylene sheeting, copper or copper compounds in the membrane).
  3. Insulation (optional).
  4. Drainage layer (synthetic drainage mesh, granular aggregate).
  5. Filter fabric (geotextile).
  6. Growing medium – AKA substrate (manufactured soil, crushed brick or other inorganic material).
  7. Vegetation (shallow-rooted on extensive roofs, deeper-rooted on intensive roofs).

 

small ARSS green roofing GRAPHS v2-1A.R.S.S.'s Role in your Green Roof Enlargement


See how they can help out your Architect, Landscaper, Project Manager or Nurserymen by protecting your asset below. 

Specification

(A.R.S.S., Architect/ Landscape Designer, Nursery, Project Manager)
  • Initial consultation with Architect or Landscaper
  • Assessment & Specification
    • Extensive or Intensive specification
    • Engineering & Construction consideration
    • Access & Structural consideration
    • Waterproofing consideration & Specification by A.R.S.S.
    • Airflow/ Breathability consideration
    • Electrical & Plumbing consideration
    • Irrigation, Water retention & or Storage consideration
    • Landscaping materials consideration
    • Plant selection
    • Warranty considerations

Design

(Architect/Landscape Designer, Project Manager, Contractors)
  • Wall or Roof concept and design and technical drawings produced by Architect, Landscaper Designer or Green Roofing firm

Construction

(A.R.S.S., Landscaper, Nurserymen, Project Manager, )
  • Co-ordinating Designer & Contractors
    • Engineering & Construction Elements
    • Site & substrate inspection
    • Containment installation
    • Handrail & Static-line installation
    • Access installation
    • Preparation & Waterproofing by A.R.S.S.
    • Drainage or Water Retention installation
    • Water Storage installation
    • Geo-textile filtration installation
    • Growing Medium Installation
    • Irrigation installation
    • Hard Landscape installation
    • Plant or Soft landscape installation